Hubei sludge disposal center
The project handles about 300 tonnes per day of municipal sludge at roughly 80% moisture, and is equipped with 6 CXCG-2000 ultra-high-pressure belt dewatering presses plus a low-temperature drying train. The ultra-high-pressure belt presses first bring the moisture down to 65%; the low-temperature drying equipment then takes it below 40%, and the sludge is sent to a power plant for incineration.