Containerized wastewater treatment for Indonesian projects.

Pre-assembled plants for community, island, industrial-estate and processing sites across the archipelago — shipped in standard ISO containers and commissioned on site.

Aerial view of a circular clarifier at a wastewater treatment plant

Segments we serve

Municipal

Municipal and community

DEWATS-aligned community systems serving a defined population.

Resort

Island resorts and hotels

properties that need reliable treatment independent of a central sewer.

Industrial

Food, beverage and textile processing

high-strength organic wastewater from processing lines.

Industrial

Palm oil processing

high-load process wastewater with solids and grease.

Industrial

Industrial estates

estate-level or stand-alone treatment for manufacturing tenants.

Camp

Construction camps

temporary sites that need treatment now and relocation later.

Medical

Hospitals and clinics

on-site wastewater treatment and medical waste incineration

Regulatory context

Indonesia regulates effluent under national environmental rules and regional by-laws (Peraturan Daerah). Discharge requirements follow from the receiving water body and the discharge volume, and are administered at both national and regional level.

Requirements vary by province and by receiving water body. Please confirm the current issuance applicable to your project with your local environmental office or your consultant.

Why containerized fits Indonesia

Archipelago logistics

Standard ISO containers move by sea to the major ports and then by road or barge to the project island.

Land constraints

A container plant needs only a small concrete pad, which suits sites where land is scarce or already developed.

Fast deployment

Because the plant is assembled and tested before shipment, on-site work is limited to foundation, connections and commissioning.

Relocatable and expandable

A plant can be moved to another site, or extended with additional containers as the service area grows.

What to send us

  • Location and province
  • Design flow (m³/day)
  • Discharge point and discharge standard
  • Power supply available on site
  • Project stage (feasibility, design, tender or construction)

Tell us what the site has to treat.