Sizing a plant to your flow and standard.

Selection is driven by two loads — hydraulic flow and organic load — and constrained by the discharge standard you have to meet. Send us the inputs below and we return a sized configuration.

A circular clarifier with its scraper bridge

What we need to size your plant

  • Daily flow (m³/day)
  • Peak flow factor
  • Influent characteristics: COD, BOD₅, TSS, NH₃-N, oil & grease, pH, temperature
  • Target discharge standard
  • Reuse intent (irrigation, flushing, or discharge only)
  • Power supply (V / Hz / phase)
  • Climate and ambient temperature range
  • Available footprint
  • Discharge point (receiving water body, soakaway or sewer)
  • Site access for container delivery

How the sizing works

  1. 1Size on hydraulic load. Daily flow and peak flow factor set the hydraulic residence time and the tank volumes.
  2. 2Size on organic load. COD and BOD₅ set the biological capacity; this often governs the plant size for high-strength wastewater such as food processing.
  3. 3Convert to containers. Required capacity ÷ capacity of one container = number of containers. Capacity of one container: [to be confirmed with factory].
  4. 4Fix the process train. A/O or MBBR, with or without MBR, follows from the discharge standard and the reuse intent.
  5. 5Check the site. Footprint and access decide whether the plant arrives as a single container or as a linked train.

Containerized plant vs on-site civil construction

AspectContainerized plantOn-site civil construction
Where it is builtShop-fabricatedBuilt on site
On-site installation workMinimal — foundation, piping, power, commissioningExtensive — civil, structural and mechanical/electrical works
FootprintCompact, on a small concrete padLarger, with fixed basins
RelocatabilityCan be moved to another siteEffectively fixed
Future expansionAdd containers as the flow growsRequires new civil works
Quality controlAssembled and tested under workshop conditionsDepends on site conditions and supervision
Civil works requiredMinimalExtensive

Skid-mounted vs containerized vs civil works: which one ships

Example of the inputs we ask for

Replace each placeholder with your own value.

Daily flow[your value] m³/day
Peak flow factor[your value]
Influent COD[your value] mg/L
Influent BOD₅[your value] mg/L
Influent TSS[your value] mg/L
Discharge standard[your value]
Power supply[your value] V / Hz / phase
Available footprint[your value] m²

Look-up charts behind the sizing method

The method above runs on a set of selection charts — population to capacity, peaking factor Kz, container loading, influent quality, effluent standards to process train, and tank volume with HRT. Every figure is labelled with the standard or statistic it comes from.

Tell us what the site has to treat.