Engineering articles on plant sizing and process choice.

Practical notes taken from the sizing work behind this site: how a design flow is built up from population and allowance, how MBR, MBBR and SBR compare, what a shipping container really holds, how a discharge standard decides the process train, what the anaerobic, anoxic and aerobic zones of an A²/O plant each remove, what a packaged plant has to have specified before it can be priced, how to read the three columns of a design influent analysis, what commissioning a packaged plant involves and what its daily operation has to watch, why a hospital or clinic produces a small flow with a heavy duty, the power and site conditions an exported plant has to be matched to before it ships, the four decisions that size an activated sludge tank, how an equalization tank is sized from a flow record rather than a percentage, and why grit removal sits in front of everything else. Every figure quoted is drawn from the selection charts and product pages here.

Light grey factory buildings and a clean loading apron at an industrial manufacturing campus

Tell us what the site has to treat.