Basis

GB 50014-2021 and HJ 576-2010 give the tank parameters. HJ 577 and HJ 579 are still pending: [to be confirmed with factory]. The extended-aeration range is from the Saudi MEWA guide.

Tank volume and HRT

HRT is the hydraulic residence time; SRT is the solids retention time. V is tank volume, Q is flow and HRT is the residence time.

ParameterValueSourceEvidence level
Anaerobic tank HRT1–2 hGB 50014-2021National standard clause
Anoxic tank HRT0.5–3.0 hHJ 576-2010National standard clause
Solids retention time, phosphorus removal as the main objective3.5–7.0 dGB 50014-2021National standard clause
Anoxic tank and aerobic tankThe standard gives no unified value; the split is balanced against the nitrogen and phosphorus removal targetsGB 50014-2021National standard clause, explicitly not given
Extended aeration, Middle EastAeration 18–36 h; MLSS 3,000–6,000 mg/L; SRT 10–30 dSaudi MEWA guideOfficial guide
Tank volume formulaV = Q × HRTGeneral—

The tank volume formula is general; the parameter values above carry the evidence levels shown.

How to use and notes

  • Use V = Q × HRT to turn a chosen residence time into a tank volume; Q is the flow at the point being sized.
  • Size the tank on the peak flow where the tank has to pass the peak, and on the average flow where the process is a biological one designed on load.
  • The anoxic and aerobic tank split is not fixed by the standard; it is balanced against the nitrogen and phosphorus removal targets.
  • The extended-aeration range is a Middle East convention from the Saudi MEWA guide, not a national-standard figure.
  • Parameters for A/O, MBBR, MBR and SBR — HRT, sludge load, carrier fill ratio and membrane flux — have not been verified beyond the national-standard anaerobic and anoxic tank figures.
  • Factory confirmation pending: HRT, sludge load, carrier fill ratio and membrane flux for each process, so the chart can be rewritten to the supplied configuration: [to be confirmed with factory].