- Home
- Saudi Arabia
Containerized wastewater treatment for Saudi projects.
Pre-assembled plants for remote, industrial, camp and municipal sites — shipped in standard ISO containers and commissioned on site, with water reuse in mind.

Segments we serve
Remote and industrial sites
facilities operating away from a central sewer network.
Labour and construction camps
temporary sites that need treatment now and relocation later.
Oil and gas facilities
on-site treatment where effluent quality and reliability matter.
Municipal and community
town and community facilities serving a defined population.
Coastal resorts
properties that need reliable treatment independent of a central sewer.
Regulatory context
In Saudi Arabia, discharge and reuse are regulated by MEWA (Ministry of Environment, Water and Agriculture) and by the National Water Company. National strategy places strong emphasis on water reuse, which makes reuse-ready treatment a common project objective.
Requirements depend on the discharge point, the reuse application and the receiving environment. Please confirm the standard applicable to your project with the relevant authority or your consultant.
Why containerized fits Saudi Arabia
Remote-site logistics
Standard ISO containers move by sea and then by road to sites far from a central sewer network.
High ambient temperature
The process train and the container envelope are specified for the ambient temperature range of the site.
Water reuse
Where reuse is the objective, the plant can be configured to produce water suitable for irrigation and landscaping.
Fast deployment
Because the plant is assembled and tested before shipment, on-site work is limited to foundation, connections and commissioning.
What to send us
- Region and site location
- Design flow (m³/day)
- Discharge or reuse target
- Power supply available on site
- Project stage (feasibility, design, tender or construction)